FEE SCHEDULE

TOWN OF SCHUYLER

 

Adopted by Resolution of the Planning Board

for

Referral to the Town Board

on

February 6, 2001

 

Adopted by Town Board

on

March 14, 2001

 

 

 

·        Residential New Construction – Building, Zoning Permit, Certificate of Occupancy: 

·        Present:  15¢ sq. ft; minimum: $120

·        Proposed:  Building permit:  $80 + Zoning Permit:  $20 ($100 total)

 

·       Additions/Alterations: 

·        Proposed:  15¢ sq. ft; minimum: $75

·        Present:  Building Permit:  $40 + Zoning Permit:  $10 ($50 total)

 

·       Manufactured Residence in Park

·        Proposed:  $75 (all others same as new construction)

·        Present:  Building Permit:  $40 + Zoning Permit:  $15 (Total $55)

 

·       Accessory Building (i.e. garage, storage sheds – no utilities)

·        Proposed:  10¢ sq. ft; Minimum: $50

·        Present:  Building Permit: $20 + Zoning Permit $10 (Total:  $30)

 

·       Sheds – portable, no ground attachment (under 200 sq. ft.)

·        Proposed:  $30

·        Present:  (none)

 

·       Pools – Above Ground

·        Proposed:  $50

·        Present:  Building Permit:  $40 + Zoning Permit:  $10 (Total:  $50) – no change

 

·       Pools – In-Ground

·        Proposed:  $75

·        Present:  Building Permit:  $40 + Zoning Permit:  $10 (Total:  $50)

 

·       Miscellaneous Fee Schedule – Wood Stove, Heating System, Fireplace:

·        Proposed:  $25

·        Present:  $20

 

·       Commercial/Multiple Residential – Building, Zoning Permit, Certificate of Occupancy:

·        Proposed:  25¢ sq. ft.; Minimum: $250

·        Present:  Building Permit:  $160; Zoning Permit:  $50 (Total $210)

 

·       Additions/Alterations:

·        Proposed:  25¢ sq. ft.; Minimum:  $150

·        Present:  Building Permit:  $80; Zoning Permit:  $30 (Total:  $110)

 

·        Accessory Building (i.e.:  Garage, Storage Building) [no utilities] [no vehicle repair]:

·        Proposed:  15¢ sq. ft.; Minimum:  $100

·        Present:  Building Permit:  $40 + Zoning Permit:  $30 (Total:  $70)

 

·       Billboards:

·        Proposed:  $250

·        Present:  (none)

 

·       Sign – Non-Illuminated: 

·        Proposed:  $1 sq. ft; Minimum:  $50

·        Present:  (none) 

 

·       Sign – Illuminated:

·        Proposed:  $1.50 sq. ft.; Minimum:  $75

·        Present:  (none) 

 

·       Home Occupations: 

·        Proposed:  $50 Annually

·        Present:  (none, except initial zoning permit fee)

 

·       Sanitation Inspection – Septic System, New:

·        Proposed:  $75

·        Present:  (none)

 

·       Sanitation Inspection – Existing Failed:

·        Proposed:  $50

·        Present:   (none)

 

·       Sanitation Inspection – Sewer Connection, New Tap: 

·        Proposed:  $50

·        Present:  (none)

 

·       Sanitation Inspection -- Existing Connection: 

·        Proposed:  $25

·        Present:  (none)

 

·       Miscellaneous Inspection: 

·        Proposed:  $25 per hr.; Minimum:  1 hr.

·        Present: (none)

 

·       Zoning Board of Appeals – Residential Area Variance:

·        Proposed:  $100 + Publication Costs

·        Present: (none)

 

·       Zoning Board of Appeals – Residential Special Use:

·        Proposed:  $100

·        Present: (none)

 

·       Zoning Board of Appeals – Commercial Area Variance:

·        Proposed:  $250 + Publication Costs

·        Present:  (none)

 

·       Zoning Board of Appeals – Commercial Special Use:

·        Proposed:  $250

·        Present:  (none)

 

·       Zoning Board of Appeals – Additional Meetings:

·        Proposed:  $100 each meeting

·        Present:  (none)

 

·       Application for Zoning Change:

·        Proposed:  $200 + Publication Costs

·        Present:  $50

 

·       Manufactured Residential Park Permit:

·        Proposed:  $2.50 per site; Minimum:  $100 Annually

·        Present:  $1 per site; Minimum:  $30

 

·       Salvage Yard Permit:

·        Proposed:  $100 Annually

·        Present:  $50 Annually